Atlas Components · Manufacturing

Line Efficiency · Per-line OEE, bottleneck, SMED · Apr 30 – May 6

···
Operations · Manufacturing · Line Efficiency

Where every minute goes.

5 of 6 lines running changeovers above SMED target. Plant-wide changeover average 21m vs 15m target. 65% of changeover time is internal — opportunity to convert to external.

MAIA agents · Line Efficiency1 active · 3 watching
Line Efficiencyactive
12decisions todayOpen
Production Watcherwatching
Re-sequenced WO-83247 to bottleneck-free path21m
14decisions todayOpen
Quality Sentinelwatching
Method drift detected L1-FA47m
6decisions todayOpen
Live feed
4M loss attribution · plant-wide · % OEE dragTOTAL LOSS 118.6%
3%5%8%10%OPERATORMACHINEMATERIALMETHOD
MACHINE
8.3%
METHOD
4.3%
OPERATOR
3.6%
MATERIAL
3.6%
Read this radar: a wider arm = more OEE drag from that source. The biggest arm tells you where to spend your shift.
OEE attribution · per line · click to drill into the 4Ms
SMED · per line · click bar to see internal/external splitTARGET 15M
Bottleneck map · cadence per line
L1-FA
84%
L2-FA
82%
L3-WLD
75%
L4-STMP
91%
L5-PAINT
22%
L6-CNC
78%
L5-PAINT is the constraint. Plant throughput will be capped here until cadence recovers.