5 of 6 lines running changeovers above SMED target. Plant-wide changeover average 21m vs 15m target. 65% of changeover time is internal — opportunity to convert to external.
MAIA agents · Line Efficiency1 active · 3 watching
Live feed
8m ago Line EfficiencyLINE-2 changeover 22m vs 15m target15m ago Line EfficiencyLINE-3 changeover 25m vs 15m target22m ago Line EfficiencyLINE-4 changeover 24m vs 15m target29m ago Line EfficiencyLINE-5 changeover 24m vs 15m target8m ago Line EfficiencyLINE-2 changeover 22m vs 15m target15m ago Line EfficiencyLINE-3 changeover 25m vs 15m target22m ago Line EfficiencyLINE-4 changeover 24m vs 15m target29m ago Line EfficiencyLINE-5 changeover 24m vs 15m target
4M loss attribution · plant-wide · % OEE dragTOTAL LOSS 119.1%
MACHINE
8.3%
METHOD
4.4%
OPERATOR
3.6%
MATERIAL
3.6%
Read this radar: a wider arm = more OEE drag from that source. The biggest arm tells you where to spend your shift.
OEE attribution · per line · click to drill into the 4Ms
SMED · per line · click bar to see internal/external splitTARGET 15M
Bottleneck map · cadence per line
L1-FA
0%
L2-FA
80%
L3-WLD
79%
L4-STMP
23%
L5-PAINT
83%
L6-CNC
0%
L1-FA is the constraint. Plant throughput will be capped here until cadence recovers.